Table of Contents

+ Add to Library

Previous Next

Chapter 211 Eat Your Fuckin Cake:>Ep2

  • By time I was done loading that my crew was there and we all headed for the place where we figured the break was. When we got there it was obvious that the North West crews hadn't gotten to the storm sewers here because the street was flooded. I sent a couple of guys back to get a vacuum truck.
  • It was 1:00 in the morning before I pierced the pavement with the backhoe. With all of the water still on the street it was slow going. By 3:00 we had the pipe exposed and began hauling away the mud I had dug out of the hole. We would have fresh dry sand and gravel from the city gravel pit to fill the hole back in.
  • At 8:45AM the water guys had finally reconnected the pipe and tested their join. The building inspector Ok'd the fix around 9:30 and by noon we were ready to re pave the area. Since the paving would be handled by a separate contractor I was able to get the equipment back to the yard by 1:00.
Get more Pearls
Go to Bravonovel app
Then you can read more chapters. And you'll find other wonderful stories on Bravonovel.